Grace Geothermal, Inc. is the leading geothermal heating and cooling company in Northeast Ohio
YMCA DREAM HOMES
Grace Geothermal has been privileged to have provided geothermal heating and cooling for each of the Lake County YMCA Dream Homes since 1995.  This demonstrates the confidence that the YMCA has in Grace Geothermal and the environmentally friendly, safe, clean, low operating cost geothermal technology, which is endorsed by both the USEPA and Department of Energy. It is the heating and cooling system for today, conserving precious resources for tomorrow.

 
 
2005
3200 Square Feet
76,687 BTUH Heat Loss
43,226 BTUH Heat Gain

5-Ton WaterFurnace®
Premier ECM

Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$493.00
$154.00
$254.00
$901.00
 Vertical Earth Loops
 

 
2004
3200 Square Feet
99.031 BTUH Heat Loss
62,076 BTUH Heat Gain
6-Ton WaterFurnace Premier E
Dual Capacity
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$569.00
$174.00
$229.00
$1001.00
Vertical Earth Loops

 
 
2003
2400 Square Feet
84,856 BTUH Heat Loss
47,987 BTUH Heat Gain
5 Ton WaterFurnace® 
 
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$549.00
$173.00
$248.00
$970.00
 Vertical Loops
 

  
2002
2700 Square Feet
82,150 BTUH Heat Loss
54,665 BTUH Heat Gain
5 Ton WaterFurnace® Premier2
2 Stage Geothermal Heating & Cooling
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$529.00
$188.00
$263.00
$980.00
5 Vertical Loops
150 Feet each
Dream House 2002
 

 
Dream House 2001
2001
3100 Square Feet
80,309 BTUH Heat Loss
41,055 BTUH Heat Gain
6 Ton WaterFurnace® Premier2
2 Stage Geothermal Heating & Cooling
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$515.00
$126.00
$265.00
$906.00
6 Vertical Loops
150 Feet each
 

 
2000
2800 Square Feet
66,170 BTUH Heat Loss
37,830 BTUH Heat Gain
5 Ton WaterFurnace® Spectra
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$529.00
$188.00
$263.00
$980.00
5 Vertical Loops
150 Feet each
Dream House 2000
 

 
Dream House 1999
1999
2600 Square Feet
52,999 BTUH Heat Loss
51,435 BTUH Heat Gain
4 Ton ClimateMaster® Genesis
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$367.00
$152.00
$257.00
$776.00
6 Vertical Loops
100 Feet each
 

 
1998
3429 Square Feet
83,851 BTUH Heat Loss
51,435 BTUH Heat Gain
5 Ton WaterFurnace® Premier2
2 Stage Geothermal Heating & Cooling
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$497.00
$156.00
$255.00
$908.00
5 Vertical Loops
150 Feet each
Dream House 1998
 

 
Dream House 1997
1997
2433 Square Feet
53,534 BTUH Heat Loss
36,495 BTUH Heat Gain
4 Ton WaterFurnace® Spectra
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$304.00
$120.00
$264.00
$688.00
4 Vertical Loops
150 Feet each
 

 
1996
3585 Square Feet
82,000 BTUH Heat Loss
59,265 BTUH Heat Gain
5.5 Ton WaterFurnace® Premier2
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$452.00
$241.00
$265.00
$958.00
Vertical Earth Loop installed by:
Fredebaugh Drilling
Ohio Trenching
Dream House 1996
 

 
Dream House 1995
1995
3000 Square Feet
74,525 BTUH Heat Loss
42,720 BTUH Heat Gain
5 Ton WaterFurnace® Premier2
2 Stage Geothermal Heating & Cooling
Estimated Annual Operating Cost
Heating
Cooling
Hot Water
Total
$396.00
$133.00
$272.00
$801.00
 Vertical Loops

 

 

 
Lake County YMCA Dream House