| YMCA DREAM HOMES |
Grace Geothermal has been privileged to have provided geothermal heating and cooling for each of the Lake County YMCA Dream Homes since 1995. This demonstrates the confidence that the YMCA has in Grace Geothermal and the environmentally friendly, safe, clean, low operating cost geothermal technology, which is endorsed by both the USEPA and Department of Energy. It is the heating and cooling system for today, conserving precious resources for tomorrow.
|
|
| |
| | 2005 | 3200 Square Feet 76,687 BTUH Heat Loss 43,226 BTUH Heat Gain
5-Ton WaterFurnace® Premier ECM | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $493.00 $154.00 $254.00 $901.00 | | Vertical Earth Loops |
|
| |
|
| |
| 2004 | 3200 Square Feet 99.031 BTUH Heat Loss 62,076 BTUH Heat Gain | 6-Ton WaterFurnace Premier E Dual Capacity | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $569.00 $174.00 $229.00 $1001.00 | | Vertical Earth Loops |
|  |
|
| |
| | | 2003 | 2400 Square Feet 84,856 BTUH Heat Loss 47,987 BTUH Heat Gain | 5 Ton WaterFurnace® | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $549.00 $173.00 $248.00 $970.00 | Vertical Loops
|
|
| |
|
| |
| 2002 | 2700 Square Feet 82,150 BTUH Heat Loss 54,665 BTUH Heat Gain | 5 Ton WaterFurnace® Premier2 2 Stage Geothermal Heating & Cooling | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $529.00 $188.00 $263.00 $980.00 | 5 Vertical Loops 150 Feet each |
|  |
| |
|
| | | |
 | | 2001 | 3100 Square Feet 80,309 BTUH Heat Loss 41,055 BTUH Heat Gain | 6 Ton WaterFurnace® Premier2 2 Stage Geothermal Heating & Cooling | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $515.00 $126.00 $265.00 $906.00 | 6 Vertical Loops 150 Feet each |
|
| |
|
| |
| 2000 | 2800 Square Feet 66,170 BTUH Heat Loss 37,830 BTUH Heat Gain | | 5 Ton WaterFurnace® Spectra | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $529.00 $188.00 $263.00 $980.00 | 5 Vertical Loops 150 Feet each |
|  |
| |
|
| |
 | | 1999 | 2600 Square Feet 52,999 BTUH Heat Loss 51,435 BTUH Heat Gain | | 4 Ton ClimateMaster® Genesis | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $367.00 $152.00 $257.00 $776.00 | 6 Vertical Loops 100 Feet each |
|
| |
|
| |
| 1998 | 3429 Square Feet 83,851 BTUH Heat Loss 51,435 BTUH Heat Gain | 5 Ton WaterFurnace® Premier2 2 Stage Geothermal Heating & Cooling | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $497.00 $156.00 $255.00 $908.00 | 5 Vertical Loops 150 Feet each |
|  |
| |
|
| | |
 | | 1997 | 2433 Square Feet 53,534 BTUH Heat Loss 36,495 BTUH Heat Gain | | 4 Ton WaterFurnace® Spectra | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $304.00 $120.00 $264.00 $688.00 | 4 Vertical Loops 150 Feet each |
|
| |
|
| |
| 1996 | 3585 Square Feet 82,000 BTUH Heat Loss 59,265 BTUH Heat Gain | | 5.5 Ton WaterFurnace® Premier2 | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $452.00 $241.00 $265.00 $958.00 | Vertical Earth Loop installed by: Fredebaugh Drilling Ohio Trenching |
|  |
| |
|
| |
 | | 1995 | 3000 Square Feet 74,525 BTUH Heat Loss 42,720 BTUH Heat Gain | 5 Ton WaterFurnace® Premier2 2 Stage Geothermal Heating & Cooling | | Estimated Annual Operating Cost | Heating Cooling Hot Water Total | $396.00 $133.00 $272.00 $801.00 | Vertical Loops
|
|
| |
|
| |